Wind · 1.1 GW · Gulf of Suez, Egypt
Suez Wind Energy
Four engagements for PowerChina on the 1.1 GW Suez Wind Energy plant: site mobilization, mobile coverage, IP telephony and video conferencing.
- Capacity
- 1.1 GW
- Period
- 2025–2026
- Engagements delivered
- 2 of 4
- Status
- In delivery
As of October 2026.
We have four engagements with PowerChina, the engineering, procurement and construction (EPC) contractor, at Suez Wind Energy’s 1.1 GW wind farm.
Two are delivered: site mobilization across the north and south sites (2025) and mobile coverage at the north site (2025–2026). Two are in delivery in 2026: IP telephony and video conferencing for the north and south substations.
- Owner
- Suez Wind Energy S.A.E. (ACWA Power and HAU Energy)
- Contracted through
- PowerChina
- Location
- Two sites on the Gulf of Suez: Ras Ghareb (north) and Ras Shokeir (south), Red Sea Governorate, Egypt
- Type
- Wind
Ras Ghareb Wind Energy
- Owner
- Ras Ghareb Wind Energy S.A.E.
- Contracted through
- Ras Ghareb Wind Energy
- Services
- ICT Advisory, Site Mobilization, Managed IT Services
- Status
- Ongoing · 2017 to present
Red Sea Wind Energy
- Owner
- Red Sea Wind Energy S.A.E.
- Contracted through
- Red Sea Wind Energy
- Services
- Site Mobilization, ICT Advisory, Managed IT Services
- Status
- Ongoing · 2020 to present
ENGIE Solar, Nadec City
- Owner
- ENGIE Solar
- Contracted through
- ENGIE
- Services
- Plant Communications, ICT Advisory
- Status
- Delivered · 2021–2022
Infinity Power Ras Ghareb
- Owner
- Masdar IPH Wind S.A.E. (Infinity Power and Masdar)
- Contracted through
- PowerChina (EPC contractor: PowerChina Huadong)
- Services
- Site Mobilization
- Status
- Delivered · 2025
Amunet Wind Power
- Owner
- Amunet Wind Power Company
- Contracted through
- PowerChina
- Services
- Site Mobilization, Managed IT Services
- Status
- Delivered · 2024–2025
Shokeir Wind Energy
- Owner
- Shokeir Wind Energy S.A.E.
- Contracted through
- Shokeir Wind Energy
- Services
- Site Mobilization, Managed IT Services, ICT Advisory, Project Disclosure Web Apps
- Status
- In delivery · 2026–2028
Suez Wind Energy
- Owner
- Suez Wind Energy S.A.E. (ACWA Power and HAU Energy)
- Contracted through
- PowerChina
- Services
- Site Mobilization, Plant Communications
- Status
- In delivery · 2025–2026
Projects by location
Egypt (8)
Saudi Arabia (1)
Our engagements
Site mobilization
- Temporary site facilities (TSF) mobilized across two sites: Ras Ghareb (north) and Ras Shokeir (south)
- Civil works and greenfield site infrastructure
- Communication towers and microwave backhaul
- Structured cabling and LAN
- Segregated VLANs for the EPC contractor, the owner and subcontractors across the construction zones
- Period
- 2025
- Status
- Delivered
- Service
- Site Mobilization
Mobile coverage
- Coverage for the Ras Ghareb (north) site
- 2G, 3G and 4G LTE coverage for 1,000 concurrent users
- Deployment licensed by the National Telecom Regulatory Authority (NTRA)
- Solar-diesel hybrid power
- Integration with the microwave backhaul
- Period
- 2025–2026
- Status
- Delivered
- Service
- Plant Communications
IP telephony
- One consolidated IP-PBX serving the north and south substations
- Desk IP phones and DECT handsets
- Multi-cell DECT coverage with base stations and repeaters
- PBX licensing, configuration and integration with the core network
- Period
- 2026
- Status
- In delivery
- Service
- Plant Communications
Video conferencing
- Meeting spaces across the north and south substations
- Video collaboration boards, including a large-format unit for the common area
- A dedicated audio-visual (AV) meeting room at the south substation
- Period
- 2026
- Status
- In delivery
- Service
- Plant Communications
Results
Our work at Suez Wind Energy runs from the construction phase into the permanent plant, for one EPC contractor.
4 engagements
Detail: Site mobilization (2025) and mobile coverage (2025–2026) delivered. IP telephony and video conferencing in delivery (2026).
1,000 concurrent users
Detail: 2G, 3G and 4G LTE mobile coverage at the Ras Ghareb (north) site
NTRA-licensed
Detail: The mobile coverage deployment is licensed by NTRA
Solar-diesel hybrid power
Detail: Power for the mobile coverage deployment
Microwave backhaul integration
Detail: Mobile coverage connected through the site’s microwave backhaul
2 substations
Detail: IP telephony and video conferencing across the north and south substations
As of October 2026.
Site photographs

Related services
- Build Site Mobilization
- Build Plant Communications
- Sector Wind farms
Plan communications for your plant
Send the location, the stage of the project and what you need.
Discuss a similar projectWe reply within one working day.
References are available on request, subject to client agreement. See our credentials.