Mobile coverage mast with its solar-diesel hybrid power supply at the Suez Wind Energy north site, Ras Ghareb, Egypt

Wind · 1.1 GW · Gulf of Suez, Egypt

Suez Wind Energy

Four engagements for PowerChina on the 1.1 GW Suez Wind Energy plant: site mobilization, mobile coverage, IP telephony and video conferencing.

Capacity
1.1 GW
Period
2025–2026
Engagements delivered
2 of 4
Status
In delivery

As of October 2026.

We have four engagements with PowerChina, the engineering, procurement and construction (EPC) contractor, at Suez Wind Energy’s 1.1 GW wind farm.

1.1 GW wind

Suez Wind Energy

Owner
Suez Wind Energy S.A.E. (ACWA Power and HAU Energy)
Contracted through
PowerChina
Services
Site Mobilization, Plant Communications
Status
In delivery · 2025–2026
Read the project

Projects by location

Our engagements

  1. Site mobilization

    • Temporary site facilities (TSF) mobilized across two sites: Ras Ghareb (north) and Ras Shokeir (south)
    • Civil works and greenfield site infrastructure
    • Communication towers and microwave backhaul
    • Structured cabling and LAN
    • Segregated VLANs for the EPC contractor, the owner and subcontractors across the construction zones
    Period
    2025
    Status
    Delivered
    Service
    Site Mobilization
  2. Mobile coverage

    • Coverage for the Ras Ghareb (north) site
    • 2G, 3G and 4G LTE coverage for 1,000 concurrent users
    • Deployment licensed by the National Telecom Regulatory Authority (NTRA)
    • Solar-diesel hybrid power
    • Integration with the microwave backhaul
    Period
    2025–2026
    Status
    Delivered
    Service
    Plant Communications
  3. IP telephony

    • One consolidated IP-PBX serving the north and south substations
    • Desk IP phones and DECT handsets
    • Multi-cell DECT coverage with base stations and repeaters
    • PBX licensing, configuration and integration with the core network
    Period
    2026
    Status
    In delivery
    Service
    Plant Communications
  4. Video conferencing

    • Meeting spaces across the north and south substations
    • Video collaboration boards, including a large-format unit for the common area
    • A dedicated audio-visual (AV) meeting room at the south substation
    Period
    2026
    Status
    In delivery
    Service
    Plant Communications

Results

Our work at Suez Wind Energy runs from the construction phase into the permanent plant, for one EPC contractor.

  • 4 engagements

    Detail: Site mobilization (2025) and mobile coverage (2025–2026) delivered. IP telephony and video conferencing in delivery (2026).

  • 1,000 concurrent users

    Detail: 2G, 3G and 4G LTE mobile coverage at the Ras Ghareb (north) site

  • NTRA-licensed

    Detail: The mobile coverage deployment is licensed by NTRA

  • Solar-diesel hybrid power

    Detail: Power for the mobile coverage deployment

  • Microwave backhaul integration

    Detail: Mobile coverage connected through the site’s microwave backhaul

  • 2 substations

    Detail: IP telephony and video conferencing across the north and south substations

As of October 2026.

Site photographs

Red and white lattice telecom mast at Suez Wind Energy, seen from its base, with its antennas at the top
Red and white lattice telecom mast at Suez Wind Energy, seen from its base, with its antennas at the top

Plan communications for your plant

Send the location, the stage of the project and what you need.

Discuss a similar project

We reply within one working day.

References are available on request, subject to client agreement. See our credentials.

Capability statement

PDF · 2 pages · 104 KB · October 2026

Download PDFOpen in a new tab