Skip to main content
Senses Innovations
A wind farm across a wide desert plain, seen from the air

Wind · 900 MW · Gulf of Suez, Egypt

Shokeir Wind Energy

Site mobilization, managed IT through construction, EPC IT submittal reviews and an English and Arabic disclosure web app for Shokeir Wind Energy’s 900 MW wind farm, 2026–2028.

Capacity
900 MW
Period
2026–2028
Status
In delivery

As of October 2026.

We work directly for Shokeir Wind Energy S.A.E. on its 900 MW wind farm, from 2026 to 2028.

900 MW wind

Shokeir Wind Energy

Owner
Shokeir Wind Energy S.A.E.
Contracted through
Shokeir Wind Energy
Services
Site Mobilization, Managed IT Services, ICT Advisory, Project Disclosure Web Apps
Status
In delivery · 2026–2028
Read the project

Projects by location

Our engagements

  1. Site mobilization, managed IT, EPC reviews and disclosure web app

    • TSF mobilization in phases, following the schedule ENGIE published on 23 March 2026: 300 MW in December 2027 and 900 MW in mid-2028
    • The site mast and licensed backhaul link complete, with permits and approvals obtained
    • Managed IT through construction, with one resident engineer on site and scheduled site visits, up to the handover to operations
    • Review of the EPC contractor’s IT submittals, on request
    • Compliance with ENGIE Group Technology Unification
    • A project disclosure web app in English and Arabic, aligned with IFC Performance Standards
    Period
    2026–2028
    Status
    In delivery
    Service
    Site Mobilization, Managed IT Services, ICT Advisory, Project Disclosure Web Apps

Plan ICT for your next wind farm

Send the location, the stage of the project and what you need.

Discuss a similar project

We reply within one working day.

References are available on request, subject to client agreement. See our credentials.

Capability statement

PDF · 2 pages · 104 KB · October 2026

Download PDFOpen in a new tab