Skip to main content
Senses Innovations
A high-voltage substation behind its perimeter wall on flat desert ground

Wind · 650 MW · Gulf of Suez, Egypt

Red Sea Wind Energy

Early-works site mobilization in 2020–2021, then managed IT services under SLA since 2021, contracted directly by Red Sea Wind Energy for its 650 MW plant.

Capacity
650 MW
Period
2020 to present
Engagements
2
Status
Ongoing

As of October 2026.

We mobilized the construction-site ICT for Red Sea Wind Energy’s 650 MW wind farm in 2020–2021, under a direct contract with the owner.

650 MW wind

Red Sea Wind Energy

Owner
Red Sea Wind Energy S.A.E.
Contracted through
Red Sea Wind Energy
Services
Site Mobilization, ICT Advisory, Managed IT Services
Status
Ongoing · 2020 to present
Read the project

Projects by location

Our engagements

  1. Site mobilization

    • Temporary site facilities (TSF) mobilized at the 220 kV Gulf of Suez substation
    • Civil works, microwave backhaul and structured cabling
    • Communications infrastructure for the construction phase
    • Segregated VLANs for the engineering, procurement and construction (EPC) contractor, the owner and subcontractors

    These were early works, carried out before the plant’s public groundbreaking in October 2022.

    Period
    2020–2021
    Status
    Delivered
    Service
    Site Mobilization
  2. Operations and maintenance (O&M) enablement

    • ITIL service desk operations
    • Management and governance of the email and collaboration platform
    • Cybersecurity enforcement and reporting, with regular technology audits
    • Managed services under SLA, including network operations at the 220 kV substation
    Period
    2021 to present
    Status
    Ongoing
    Service
    ICT Advisory, Managed IT Services

Plan your plant’s ICT from mobilization to operation

Send the location, the stage of the project and what you need.

Discuss a similar project

We reply within one working day.

References are available on request, subject to client agreement. See our credentials.

Capability statement

PDF · 2 pages · 104 KB · October 2026