We deliver the information and communications technology (ICT) that a wind or solar plant needs at each stage, for plants in Egypt, Saudi Arabia and the UAE. We review the engineering, procurement and construction (EPC) contractor’s ICT design, connect the construction site, install the plant’s permanent communications and run its IT under a service level agreement (SLA) from commercial operation.

Send an inquiry

We reply within one working day.

Our services by stage

The services are listed in the order a plant needs them, from design review to operation.

  • Advise

    ICT Advisory

    Oversight of the EPC contractor’s ICT, audits against group technology standards, network and radio (RF) design, and site surveys.

    For: Owners we contract with directly

    ICT Advisory
  • Build

    Site Mobilization

    Connectivity for the temporary site facilities (TSF): the National Telecom Regulatory Authority (NTRA) and military approvals, mast, licensed microwave link and separate networks for each party. About 8 weeks from survey to handover.

    For: EPC contractors and owners

    Site Mobilization
  • Build

    Plant Communications

    IP telephony and DECT, video conferencing, mobile coverage and outdoor wireless for the substation and plant buildings, commissioned and ready for Taking-Over.

    For: EPC contractors and owners

    Plant Communications
  • Operate

    Managed IT Services

    Service desk, email and collaboration, identity, cybersecurity and substation network operations under SLA. Running for wind farm owners in Egypt since 2018.

    For: Owners

    Managed IT Services
  • Supporting

    Project Disclosure Web Apps

    Arabic and English websites that publish a project’s environmental and social impact assessment (ESIA), stakeholder engagement plan and grievance mechanism, aligned to IFC Performance Standards.

    For: Project companies (SPVs) and their lenders

    Project Disclosure Web Apps

Each stage hands over to the next

A plant needs ICT at four points:

  • while the design is checked
  • while the site is built
  • before the EPC contractor hands the plant to the owner
  • through the decades of operation that follow

Each of our services covers one of these points and starts from what the previous one handed over.

  1. Stage: Advise

    ICT Advisory

    When it runs
    During design, then at set stages through construction
    What it leaves for the next stage
    Review and audit findings, and a design checked against the owner’s group standards
  2. Stage: Build

    Site Mobilization

    When it runs
    The first weeks of construction
    What it leaves for the next stage
    A working site network and its handover pack: as-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report
  3. Stage: Build

    Plant Communications

    When it runs
    Before the EPC contractor’s Taking-Over Certificate
    What it leaves for the next stage
    Commissioned networks, unified communications, wireless and mobile coverage, handed over to the owner
  4. Stage: Operate

    Managed IT Services

    When it runs
    From handover of the site network or from commercial operation (COD), for as long as the contract runs
    What it leaves for the next stage
    A monthly report on uptime, bandwidth and incidents

Project Disclosure Web Apps runs alongside these stages for the project company and its lenders.

You can contract each service on its own, or several on the same plant, as Ras Ghareb Wind Energy and Red Sea Wind Energy have done.

Plant ICT falls between contracts

The EPC contractor’s scope ends at handover, the turbine maker covers its own equipment, and the owner’s group IT starts once the plant is in operation. The site network and the people who know it have to pass from one contract to the next. We work across those boundaries on the same plant.

Plants where we covered more than one stage

  • Plant
    Ras Ghareb Wind Energy, 262.5 MW
    During construction
    Site mobilization and EPC reviews, 2017–2018
    Into operation
    Managed services since 2018
  • Plant
    Red Sea Wind Energy, 650 MW
    During construction
    Site mobilization, 2020–2021
    Into operation
    Managed services under SLA since 2021
  • Plant
    Amunet Wind Power, 500 MW
    During construction
    Site mobilization, 2024
    Into operation
    Operations enablement and handover, 2025

As of October 2026.

Start from your plant’s stage

  • Build

    Building a plant?

    Connectivity for the construction site, then the plant’s permanent systems, ready for Taking-Over.

  • Operate

    Operating a plant?

    The plant’s IT run under a service level agreement (SLA), by the team that built the site network.

Frequently asked questions

Can we contract one service on its own?

Yes. Each service is contracted separately. Five of our nine projects were a single engagement (as of October 2026).

Do you contract with the owner or the EPC contractor?

Both. EPC contractors contract us for construction-phase scopes, as PowerChina did on three wind farms, and for the handover into operation, as on Amunet Wind Power. Owners contract us directly, as ENGIE does for its wind companies in Egypt.

Where do you work?

We take on work for plants in Egypt, Saudi Arabia and the UAE. Our projects to date are in Egypt and Saudi Arabia. Most of them are wind farms on Egypt’s Gulf of Suez, around Ras Ghareb and Ras Shokeir. Our field team is based in Ras Ghareb.

Do you work on solar plants?

Yes. Our solar project to date is the ENGIE Solar plant at Nadec City in Saudi Arabia (30 MW). There we planned and installed outdoor wireless for the panel-cleaning robots in 2021–2022.

How long does it take to connect a construction site?

About 8 weeks from survey to handover under our standard programme. On Infinity Power’s Ras Ghareb site, the network went live 7 weeks after the survey. Once the scope is contracted, the site can be connected before financial close.

What do we receive when a stage ends?

For a construction-site network, a site acceptance test (SAT) and a handover pack: as-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report. For managed services, a monthly report on uptime, bandwidth and incidents.

Tell us which stage your plant is at

Send the site location, the stage of the project and the scope you need. We reply within one working day.

Send an inquiry

Capability statement

PDF · 2 pages · 104 KB · October 2026

Download PDFOpen in a new tab