ICT from construction to operation
We deliver the information and communications technology (ICT) that a wind or solar plant needs at each stage, for plants in Egypt, Saudi Arabia and the UAE. We review the engineering, procurement and construction (EPC) contractor’s ICT design, connect the construction site, install the plant’s permanent communications and run its IT under a service level agreement (SLA) from commercial operation.
We reply within one working day.
Our services by stage
The services are listed in the order a plant needs them, from design review to operation.
- Advise
ICT Advisory
Oversight of the EPC contractor’s ICT, audits against group technology standards, network and radio (RF) design, and site surveys.
For: Owners we contract with directly
ICT Advisory - Build
Site Mobilization
Connectivity for the temporary site facilities (TSF): the National Telecom Regulatory Authority (NTRA) and military approvals, mast, licensed microwave link and separate networks for each party. About 8 weeks from survey to handover.
For: EPC contractors and owners
Site Mobilization - Build
Plant Communications
IP telephony and DECT, video conferencing, mobile coverage and outdoor wireless for the substation and plant buildings, commissioned and ready for Taking-Over.
For: EPC contractors and owners
Plant Communications - Operate
Managed IT Services
Service desk, email and collaboration, identity, cybersecurity and substation network operations under SLA. Running for wind farm owners in Egypt since 2018.
For: Owners
Managed IT Services - Supporting
Project Disclosure Web Apps
Arabic and English websites that publish a project’s environmental and social impact assessment (ESIA), stakeholder engagement plan and grievance mechanism, aligned to IFC Performance Standards.
For: Project companies (SPVs) and their lenders
Project Disclosure Web Apps
Each stage hands over to the next
A plant needs ICT at four points:
- while the design is checked
- while the site is built
- before the EPC contractor hands the plant to the owner
- through the decades of operation that follow
Each of our services covers one of these points and starts from what the previous one handed over.
- Stage: Advise
ICT Advisory
- When it runs
- During design, then at set stages through construction
- What it leaves for the next stage
- Review and audit findings, and a design checked against the owner’s group standards
- Stage: Build
Site Mobilization
- When it runs
- The first weeks of construction
- What it leaves for the next stage
- A working site network and its handover pack: as-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report
- Stage: Build
Plant Communications
- When it runs
- Before the EPC contractor’s Taking-Over Certificate
- What it leaves for the next stage
- Commissioned networks, unified communications, wireless and mobile coverage, handed over to the owner
- Stage: Operate
Managed IT Services
- When it runs
- From handover of the site network or from commercial operation (COD), for as long as the contract runs
- What it leaves for the next stage
- A monthly report on uptime, bandwidth and incidents
Project Disclosure Web Apps runs alongside these stages for the project company and its lenders.
You can contract each service on its own, or several on the same plant, as Ras Ghareb Wind Energy and Red Sea Wind Energy have done.
Plant ICT falls between contracts
The EPC contractor’s scope ends at handover, the turbine maker covers its own equipment, and the owner’s group IT starts once the plant is in operation. The site network and the people who know it have to pass from one contract to the next. We work across those boundaries on the same plant.
Plants where we covered more than one stage
| Plant | During construction | Into operation |
|---|---|---|
| Ras Ghareb Wind Energy, 262.5 MW | Site mobilization and EPC reviews, 2017–2018 | Managed services since 2018 |
| Red Sea Wind Energy, 650 MW | Site mobilization, 2020–2021 | Managed services under SLA since 2021 |
| Amunet Wind Power, 500 MW | Site mobilization, 2024 | Operations enablement and handover, 2025 |
- Plant
- Ras Ghareb Wind Energy, 262.5 MW
- During construction
- Site mobilization and EPC reviews, 2017–2018
- Into operation
- Managed services since 2018
- Plant
- Red Sea Wind Energy, 650 MW
- During construction
- Site mobilization, 2020–2021
- Into operation
- Managed services under SLA since 2021
- Plant
- Amunet Wind Power, 500 MW
- During construction
- Site mobilization, 2024
- Into operation
- Operations enablement and handover, 2025
As of October 2026.
Start from your plant’s stage
- Build
Building a plant?
Connectivity for the construction site, then the plant’s permanent systems, ready for Taking-Over.
- Operate
Operating a plant?
The plant’s IT run under a service level agreement (SLA), by the team that built the site network.
Frequently asked questions
Can we contract one service on its own?
Yes. Each service is contracted separately. Five of our nine projects were a single engagement (as of October 2026).
Do you contract with the owner or the EPC contractor?
Both. EPC contractors contract us for construction-phase scopes, as PowerChina did on three wind farms, and for the handover into operation, as on Amunet Wind Power. Owners contract us directly, as ENGIE does for its wind companies in Egypt.
Where do you work?
We take on work for plants in Egypt, Saudi Arabia and the UAE. Our projects to date are in Egypt and Saudi Arabia. Most of them are wind farms on Egypt’s Gulf of Suez, around Ras Ghareb and Ras Shokeir. Our field team is based in Ras Ghareb.
Do you work on solar plants?
Yes. Our solar project to date is the ENGIE Solar plant at Nadec City in Saudi Arabia (30 MW). There we planned and installed outdoor wireless for the panel-cleaning robots in 2021–2022.
How long does it take to connect a construction site?
About 8 weeks from survey to handover under our standard programme. On Infinity Power’s Ras Ghareb site, the network went live 7 weeks after the survey. Once the scope is contracted, the site can be connected before financial close.
What do we receive when a stage ends?
For a construction-site network, a site acceptance test (SAT) and a handover pack: as-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report. For managed services, a monthly report on uptime, bandwidth and incidents.
Tell us which stage your plant is at
Send the site location, the stage of the project and the scope you need. We reply within one working day.
Send an inquiry