Construction connectivity for renewable projects
We connect the offices, camps and stores a renewable project uses during construction. It takes about 8 weeks from survey to handover.
We reply within one working day.
- from survey to handover, under our standard programme
- About 8 weeks
- from survey to go-live on Infinity Power’s Ras Ghareb site
- 7 weeks
- wind farms in Egypt where we delivered construction-phase ICT
- 5
Figures as of October 2026.
For EPC contractors and owners at mobilization
Engineering, procurement and construction (EPC) contractors buy site connectivity as part of their mobilization scope. PowerChina contracted us for turnkey delivery on three wind farms: Infinity Power’s Ras Ghareb project, Amunet Wind Power and Suez Wind Energy.
Owners also contract it directly. ENGIE did so on Ras Ghareb Wind Energy and Red Sea Wind Energy, and we went on to run IT for both plants.
Once the scope is contracted, the site can be connected before financial close. On Infinity Power’s 200 MW project, we mobilized for PowerChina before financial close, while the site offices were still to be built, so the site had communications from the start of construction.
Our method, step by step
We follow the same steps on every construction site. Each contract sets the details.
| Step | What happens |
|---|---|
| 1. Site survey | We survey the site and run a line-of-sight study for the microwave link. |
| 2. Wireless design | A predictive Wi-Fi design and an on-site Wi-Fi survey set the access point layout. We issue the layout to the EPC contractor for cabling. |
| 3. Approvals | We coordinate the military and National Telecom Regulatory Authority (NTRA) approvals for the microwave link. |
| 4. Mast and backhaul | We install a 30 m mast and a licensed microwave link from one of the licensed telecom operators we work with. The client contracts the operator directly, and we add no markup to the connection. |
| 5. Separate networks | Each party on site gets its own network segment, wireless network and bandwidth limit. Visitors connect through a captive portal. |
| 6. Site acceptance test (SAT) | We test the installed network before handover. |
| 7. Handover pack | As-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report. |
| 8. Managed service | We run the network after handover, as described below. |
- Step
- 1. Site survey
- What happens
- We survey the site and run a line-of-sight study for the microwave link.
- Step
- 2. Wireless design
- What happens
- A predictive Wi-Fi design and an on-site Wi-Fi survey set the access point layout. We issue the layout to the EPC contractor for cabling.
- Step
- 3. Approvals
- What happens
- We coordinate the military and National Telecom Regulatory Authority (NTRA) approvals for the microwave link.
- Step
- 4. Mast and backhaul
- What happens
- We install a 30 m mast and a licensed microwave link from one of the licensed telecom operators we work with. The client contracts the operator directly, and we add no markup to the connection.
- Step
- 5. Separate networks
- What happens
- Each party on site gets its own network segment, wireless network and bandwidth limit. Visitors connect through a captive portal.
- Step
- 6. Site acceptance test (SAT)
- What happens
- We test the installed network before handover.
- Step
- 7. Handover pack
- What happens
- As-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report.
- Step
- 8. Managed service
- What happens
- We run the network after handover, as described below.
About 8 weeks from survey to handover
Our standard programme for a construction-site network has four phases.
| Phase | What happens |
|---|---|
| 1. Survey and approvals | Site survey, line-of-sight study, wireless design and the military and NTRA approvals |
| 2. Procurement and civil works | We order the equipment and carry out the civil works |
| 3. Installation | Mast, microwave link, network equipment and access points |
| 4. Commissioning and handover | SAT, handover pack and the start of the managed service |
- Phase
- 1. Survey and approvals
- What happens
- Site survey, line-of-sight study, wireless design and the military and NTRA approvals
- Phase
- 2. Procurement and civil works
- What happens
- We order the equipment and carry out the civil works
- Phase
- 3. Installation
- What happens
- Mast, microwave link, network equipment and access points
- Phase
- 4. Commissioning and handover
- What happens
- SAT, handover pack and the start of the managed service
Each contract sets its own programme. The table shows our standard.
On Infinity Power’s Ras Ghareb site, the network went live 7 weeks after the survey.
Separate networks for each party on site
The owner, the EPC contractor, third parties (such as subcontractors) and visitors each get their own network segment. Each segment has its own wireless network and its own bandwidth limit, so heavy use by one party leaves the others their share. Visitors log in through a captive portal.
Every construction site we have connected has had separate networks for the owner and the EPC contractor, with further networks for subcontractors or guests.
Who does what on a typical site
This is the usual split. Each contract sets the final one.
| Party | Usually responsible for |
|---|---|
| Senses Innovations | Site survey and line-of-sight study; wireless design; coordinating the military and NTRA approvals; civil works and the 30 m mast; the active network and access points; SAT and handover pack; the managed service, including fault liaison with the operator |
| EPC contractor | Passive cabling to our access point layout, rack space and AC power. On some sites, such as Red Sea Wind Energy, Amunet Wind Power and Suez Wind Energy, we installed the structured cabling as well. |
| Licensed telecom operator | The licensed microwave link service and the internet connection |
| Owner | Signing the operator’s service agreement and the clearance documents for the approvals |
- Party
- Senses Innovations
- Usually responsible for
- Site survey and line-of-sight study; wireless design; coordinating the military and NTRA approvals; civil works and the 30 m mast; the active network and access points; SAT and handover pack; the managed service, including fault liaison with the operator
- Party
- EPC contractor
- Usually responsible for
- Passive cabling to our access point layout, rack space and AC power. On some sites, such as Red Sea Wind Energy, Amunet Wind Power and Suez Wind Energy, we installed the structured cabling as well.
- Party
- Licensed telecom operator
- Usually responsible for
- The licensed microwave link service and the internet connection
- Party
- Owner
- Usually responsible for
- Signing the operator’s service agreement and the clearance documents for the approvals
Standard security baseline for site networks
Our standard baseline:
- separate network segments for each party
- default credentials changed
- critical firmware patches applied within 15 days
- configuration backed up weekly
- logs kept for 90 days
How we run the site network
| Item | Our standard |
|---|---|
| Monitoring | Automated monitoring 24 hours a day, 7 days a week |
| Incidents | Handled remotely or on site |
| Priority 1 incidents | Acknowledged within 1 hour, at any time |
| Service hours | Sunday to Thursday, 9:00 to 18:00 Egypt time, excluding Egyptian public holidays |
| Maintenance | Health checks and planned maintenance |
| Operator faults | We raise faults with the operator and follow them to resolution |
| Escalation | Senses Service Desk, then Service Delivery Manager, then Managing Director |
| Reporting | Monthly report on uptime, bandwidth and incidents |
| On site | Field team based in Ras Ghareb |
- Item
- Monitoring
- Our standard
- Automated monitoring 24 hours a day, 7 days a week
- Item
- Incidents
- Our standard
- Handled remotely or on site
- Item
- Priority 1 incidents
- Our standard
- Acknowledged within 1 hour, at any time
- Item
- Service hours
- Our standard
- Sunday to Thursday, 9:00 to 18:00 Egypt time, excluding Egyptian public holidays
- Item
- Maintenance
- Our standard
- Health checks and planned maintenance
- Item
- Operator faults
- Our standard
- We raise faults with the operator and follow them to resolution
- Item
- Escalation
- Our standard
- Senses Service Desk, then Service Delivery Manager, then Managing Director
- Item
- Reporting
- Our standard
- Monthly report on uptime, bandwidth and incidents
- Item
- On site
- Our standard
- Field team based in Ras Ghareb
Each contract sets its own service levels. On Infinity Power’s Ras Ghareb site, the service level agreement (SLA) target was 99.7%.
Frequently asked questions
How long does it take to connect a construction site?
About 8 weeks from survey to handover under our standard programme. On Infinity Power’s 200 MW site in Ras Ghareb, the network went live 7 weeks after the survey.
Who gets the NTRA and military approvals?
We prepare and coordinate the military and NTRA approvals for the microwave link. The owner signs the clearance documents that the approvals need.
Who contracts the internet operator?
Our client does, usually the owner. The client signs the service agreement with a licensed telecom operator, and we add no markup to the connection. We install the mast and the link equipment, and follow any faults with the operator.
Can the site be connected before financial close?
Yes, once the scope is contracted. On Infinity Power’s Ras Ghareb project, we mobilized before financial close.
How are the owner’s and the EPC contractor’s networks kept apart?
Each party has its own network segment, wireless network and bandwidth limit, and visitors use a captive portal. Every construction site we have connected has had separate networks for the owner and the EPC contractor, with further networks for subcontractors or guests.
What do we receive at handover?
After the site acceptance test (SAT), a handover pack with the as-built drawings, IP and VLAN inventory, test reports, port matrix and wireless survey report.
Plan connectivity for your site
Send the site location, the mobilization date and the parties who need access. We reply within one working day.
Discuss your siteFor prequalification, see our credentials and capability statement.