Wind turbines on rocky ground beside the sea

Wind · 200 MW · Ras Ghareb, Egypt

Infinity Power Ras Ghareb

Turnkey site connectivity for PowerChina at Infinity Power’s 200 MW Ras Ghareb wind farm, from survey to go-live in 7 weeks (2025).

Capacity
200 MW
Period
2025
Status
Delivered

As of October 2026.

We delivered turnkey site connectivity in 2025 for PowerChina, the engineering, procurement and construction (EPC) contractor at Infinity Power’s 200 MW wind farm at Ras Ghareb.

200 MW wind

Infinity Power Ras Ghareb

Owner
Masdar IPH Wind S.A.E. (Infinity Power and Masdar)
Contracted through
PowerChina (EPC contractor: PowerChina Huadong)
Services
Site Mobilization
Status
Delivered · 2025
Read the project

Projects by location

Our engagements

  1. Turnkey connectivity

    • Communication masts and microwave antennas
    • NTRA permits and activation of internet service from a licensed operator
    • Segregated VLANs for the EPC contractor, the owner and guests
    • VPN access, managed Power over Ethernet (PoE) and indoor access points
    • A service level agreement (SLA) target of 99.7%
    • 7 weeks from survey to go-live, with mobilization before financial close
    Period
    2025
    Status
    Delivered
    Service
    Site Mobilization

Results

  • 7 weeks

    Detail: From site survey to go-live

  • Mobilized before financial close

    Detail: We mobilized for PowerChina before financial close, while the site offices were still to be built, so the site had communications from the start of construction.

  • 3 segregated networks

    Detail: Separate VLANs for the EPC contractor, the owner and guests, with VPN access, managed PoE and indoor access points

  • 99.7% SLA target

    Detail: The service level target for the site connectivity

As of October 2026. The 99.7% figure is the SLA target.

Connect your construction site

Send the location, the stage of the project and what you need.

Discuss a similar project

We reply within one working day.

References are available on request, subject to client agreement. See our credentials.

Capability statement

PDF · 2 pages · 104 KB · October 2026

Download PDFOpen in a new tab