Construction sites, Plant communications
Separating owner, EPC contractor and subcontractor networks on a construction site
A reference design for site networks, and how IEC 62443 zones and conduits apply at the substation.
, 7 min read
Field notes on ICT for wind and solar plants, from the first site survey to commercial operation and managed IT, drawn from our projects in Egypt and Saudi Arabia.
Showing 1 of 2 articles
Construction sites, Plant communications
A reference design for site networks, and how IEC 62443 zones and conduits apply at the substation.
, 7 min read
Send the location, the stage of the project and what you need.
Send an inquiryWe reply within one working day.